Section 10 Recommendations
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
10-2
cost of $456,447,545 and an estimated non-Federal first cost of $456,447,545.
The estimated total annual cost of operation, maintenance, repair, rehabilitation
and replacement is $2,413,982 with an estimated Federal annual cost of
$1,206,991 and an estimated non-Federal cost of $1,206,991.
The above recommendations are made with the provision that the Non-Federal
Sponsor and the Secretary of the Army shall enter into a binding agreement
defining the terms and conditions of cooperation for implementing the Project,
and that the Non-Federal Sponsor agrees to perform the following items of local
cooperation:
a) Provide 50 percent of total project costs consistent with the provisions of
Section 601(e) of the Water Resources Development Act of 2000.
b) Provide all lands, easements, and rights-of-way, and perform or assure
the performance of all relocations determined necessary for the
construction, operation, and maintenance of the project.
c) Provide or pay to the Government the cost of providing all retaining dikes,
waste weirs, bulkheads, and embankments, including all monitoring
features and stilling basins, that may be required at any dredged or
excavated material disposal areas required for the construction, operation,
and maintenance of the project.
d) Give the Government a right to enter, at reasonable times and in a
reasonable manner, upon land that the local sponsor owns or controls for
access to the project for the purpose of inspection, and, if necessary, for
the purpose of completing, operating, maintaining, repairing, replacing, or
rehabilitating the project.
e) Assume responsibility for operating, maintaining, replacing, repairing,
and rehabilitating (OMRR&R) the project or completed functional portions
of the project in a manner compatible with the project’s authorized
purposes an in accordance with applicable Federal and State laws and
specific directions prescribed in the OMRR&R manuals and any
subsequent amendments thereto. Cost sharing for OMRR&R will be in
accordance with Section 601 of WRDA 2000:
“(e) COST SHARING.-
(4) OPERATION AND MAINTENANCE.
- Notwithstanding section 528(e)(3) of the Water Resources
Development Act of 1996 (110 Stat. 3770), the Non-Federal Sponsor
shall be responsible for 50 percent of the cost of operation,
maintenance, repair, replacements and rehabilitation activities
authorized under this section…”
f) The non-Federal Sponsor shall operate, maintain, repair, replace and
rehabilitate the recreational features of the project and shall be
responsible for 100 percent of the cost.