
Section 5 Formulation of Alternative Plans
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
5-14
FIGURE 5-1: ALTERNATIVE 2 DESIGN LAYOUT.
TABLE 5-3: ALTERNATIVE 2 DESIGN SUMMARY.
Parameter Values
Design Parameter
Cell 1 Cell 2
Storage Area (acres) 17,000 45,000
Normal Pool Depth (feet) 6 6
Total Fill Rate (cfs) 2,775 5,200
Time to Fill (days) 19 26
Drawdown Rate (cfs) 4,000 6,000
Time to Drawdown (days) 13 23
Comentários a estes Manuais